Platforms in parallel
The same towable machine, more than one of it, paralleled on the AC side. The build stays the one we already publish — same trailer, same array, same 48 V bank, same service parts — and the site gets as many as the load needs.
Three of the largest published platform is 54 kW — well inside what the inverter's own sheet permits, and still three machines to tow, site and service.
